Skip to content
VQOS
WorkspacePost a brief

VQOS / article

After Sora API Retirement: Video Costs and a Migration Checklist

Check the official retirement dates, retain project assets and price the complete migration. Historical generation rates are not current purchase quotes.

By:VQOS 编辑部VerifiedPublished:Updated:

Revision note:Verified official retirement dates; removed outdated trial advice and current-price implications; added an independent migration checklist.

Establish the status first

As of September 30, 2026, the OpenAI deprecation documentation lists September 24 as the shutdown date for the Videos API and Sora 2 family. The official help article records April 26 as the end of the web and app experiences. New commissions should not treat the retired API as a continuing service or a short-term trial option. This article reviews public announcements; it does not report account or endpoint testing.

Inventory the assets still needed

VQOS recommends listing generated clips, prompts, references, subtitles, editing projects and permission records. Check that files are saved, accessible and usable by the responsible team. The help article's product export instructions should not be assumed to recover every historical API task.

Price the whole migration

Historical model rates describe earlier costs, not available quotes. Ask an alternative provider to separate pilot work, retries, shot rebuilding, audio, subtitles, editing and delivery variants. Check confidentiality and commercial permissions. Reusing a prompt does not guarantee the same result from a different model.

Validate a limited sequence

Choose a difficult shot, such as a character turning or a close product view. Agree on references, action, duration and acceptance criteria, then retain outputs and correction records. Review identity, product accuracy, motion, sound and final file specifications. This is a proposed pilot; no alternative model was tested for this article and direct interface compatibility is not promised.

Record the change in the commission

Agree who handles migration, which approved shots must be rebuilt, and how additional costs and dates will be confirmed. Keep both previous versions and new review records. Read VQOS production services and describe migration scope in your production brief. Expand only after the retained assets and critical replacement shots have passed review.

Continue reading

Browse all articles ↗